{"id":2857749,"version":0,"headline":"ADB, World Bank fund Timor-Leste’s first solar farm","dateModified":"2026-07-28T11:34:30Z","datePublished":"2026-07-28T11:18:24Z","articleBody":"<article><p class=\"lead\">The Asian Development Bank (ADB) and World Bank, alongside Japan and Canada, are funding Timor-Leste's first utility-scale solar and battery storage project, the ADB said on 27 July.</p><p>The 74MW solar plant and 80MWh battery system is set to also be Timor-Leste's first independent power project. Manatuto Renewables Power, set up by subsidiaries of French utility EDF and Japanese firm Itochu, is leading the project.</p><p>The project started construction last week and is expected to finish by 2028, the Timor-Leste embassy in Tokyo said last week.</p><p>When operational, the facility will deliver 134GWh and avoid nearly 93,000 t/yr of CO2 equivalent, according to the ADB.</p><p>Electricity will be sold to state utility Eletricidade de Timor Leste, Empresa Pública under a 25-year power purchase agreement.</p><p>ADB is providing $33.4mn for the project, including a tranche of concessional loans supported by Japan and Canada. The World Bank is contributing $40.2mn, part of which is also concessional loans. Japan is separately chipping in $12.2mn, bringing total funding to $85.7mn.</p><p>The World Bank also approved a 20-year political risk insurance to the EDF and Itochu entities involved in the project.</p><p>Timor-Leste wants to meet half of its energy needs from renewable sources by 2030. Currently diesel-based thermal plants account for almost all of the southeast Asian country's installed power capacity of around 276MW, ADB said.</p><p class=\"bylines\">By Liang Lei</p></article>","dateline":"Singapore, 28 July (Argus)","license":"<footer><p><br> Send comments and request more information at <a href=\"mailto:feedback@argusmedia.com?subject=Argus Direct article feedback&body=I am contacting you regarding ADB, World Bank fund Timor-Leste’s first solar farm, available at http://direct.argusmedia.com/newsandanalysis/article/cs-24917177.\" target=\"_parent\"> feedback@argusmedia.com </a></p><p><i> Copyright © 2026. <a href=\"http://www.argusmedia.com/\" target=\"_blank\">Argus Media group</a>. All rights reserved. </i></p></footer>","copyrightHolder":"Argus Media group","copyrightYear":2026,"taxonomy":{"contexts":[{"name":"Fundamentals","children":[]}],"regions":[{"name":"Asia-Pacific","children":[{"name":"Southeast Asia","children":[{"name":"East Timor","children":[]}]}]}],"sectors":[{"name":"Electricity","children":[{"name":"Renewables","children":[]}]}]},"pullQuote":null,"newsType":"Daily news","language":"en-GB","keywords":null,"isFree":true,"isFeatured":false,"body":"<p class=\"lead\">The Asian Development Bank (ADB) and World Bank, alongside Japan and Canada, are funding Timor-Leste's first utility-scale solar and battery storage project, the ADB said on 27 July.</p><p>The 74MW solar plant and 80MWh battery system is set to also be Timor-Leste's first independent power project. Manatuto Renewables Power, set up by subsidiaries of French utility EDF and Japanese firm Itochu, is leading the project.</p><p>The project started construction last week and is expected to finish by 2028, the Timor-Leste embassy in Tokyo said last week.</p><p>When operational, the facility will deliver 134GWh and avoid nearly 93,000 t/yr of CO2 equivalent, according to the ADB.</p><p>Electricity will be sold to state utility Eletricidade de Timor Leste, Empresa Pública under a 25-year power purchase agreement.</p><p>ADB is providing $33.4mn for the project, including a tranche of concessional loans supported by Japan and Canada. The World Bank is contributing $40.2mn, part of which is also concessional loans. Japan is separately chipping in $12.2mn, bringing total funding to $85.7mn.</p><p>The World Bank also approved a 20-year political risk insurance to the EDF and Itochu entities involved in the project.</p><p>Timor-Leste wants to meet half of its energy needs from renewable sources by 2030. Currently diesel-based thermal plants account for almost all of the southeast Asian country's installed power capacity of around 276MW, ADB said.</p><p class=\"bylines\">By Liang Lei</p>","lead":"The Asian Development Bank (ADB) and World Bank, alongside Japan and Canada, are funding Timor-Leste's first utility-scale solar and battery storage project, the ADB said on 27 July.","cmsId":"24917177","source":"Censhare"}