{"id":2854779,"version":0,"headline":"India's Delectrik wins 100MWh VRFB storage project","dateModified":"2026-07-21T06:59:20Z","datePublished":"2026-07-21T06:58:30Z","articleBody":"<article><p class=\"lead\">India's state-owned NTPC Renewable Energy (NTPC REL) has awarded an engineering, procurement and construction contract to battery storage firm Delectrik Systems for a 100MWh vanadium redox flow battery (VRFB) energy storage system.</p><p>The project will be developed by technology provider Delectrik Systems in partnership with Bondada Engineering at Gujarat's Khavda Solar Park, marking the country's first utility-scale deployment of the long-duration storage technology. The battery energy storage system (Bess) is scheduled to be commissioned in the second half of 2027, Delectrik told <i>Argus</i> on 21 July.</p><p>The electrolyte will be manufactured at Delectrik's Gujarat facility, while the cell stacks will be produced at its Gurugram plant, chief executive Vishal Mittal told <i>Argus</i>, supporting domestic manufacturing of key project components. VRFBs store energy in liquid vanadium electrolyte while electricity is generated through cell stacks, enabling longer-duration storage by independently scaling energy capacity and power output.</p><p>The project is expected to be India's first grid-scale, non-lithium Bess project, broadening the country's storage technology mix beyond lithium-ion batteries that dominate current deployments, the company said. </p><p>Delectrik expects additional utility-scale VRFB opportunities in India over the next 12-24 months, including government tenders and commercial and industrial projects, Mittal said. The company pointed to a 120MWh VRFB tender issued by state-owned Gujarat Industries Power (GIPCL), for which bidding has closed and an award is expected in the coming weeks.</p><p>Delectrik previously deployed a 3MWh VRFB demonstration project for NTPC at Greater Noida in 2025.</p><p>India has 35.8GWh of Bess capacity under implementation as of March, according to the power ministry. The Central Electricity Authority's National Electricity Plan (2023) projects a requirement of 208GWh of Bess by 2030 to support the integration of growing renewable energy capacity into the grid.</p><p class=\"bylines\">By Keertiman Upadhyay</p></article>","dateline":"Mumbai, 21 July (Argus)","license":"<footer><p><br> Send comments and request more information at <a href=\"mailto:feedback@argusmedia.com?subject=Argus Direct article feedback&body=I am contacting you regarding India's Delectrik wins 100MWh VRFB storage project, available at http://direct.argusmedia.com/newsandanalysis/article/cs-24863863.\" target=\"_parent\"> feedback@argusmedia.com </a></p><p><i> Copyright © 2026. <a href=\"http://www.argusmedia.com/\" target=\"_blank\">Argus Media group</a>. All rights reserved. </i></p></footer>","copyrightHolder":"Argus Media group","copyrightYear":2026,"taxonomy":{"contexts":[{"name":"Infrastructure","children":[{"name":"Grid","children":[]}]}],"regions":[{"name":"Asia-Pacific","children":[{"name":"South Asia","children":[{"name":"India","children":[]}]}]}],"sectors":[{"name":"Battery materials","children":[]},{"name":"Electricity","children":[{"name":"Renewables","children":[{"name":"Solar","children":[]}]}]},{"name":"Metals","children":[{"name":"Non-ferrous","children":[{"name":"Minor metals","children":[{"name":"Vanadium","children":[]}]}]}]}]},"pullQuote":null,"newsType":"Daily news","language":"en-GB","keywords":null,"isFree":true,"isFeatured":false,"body":"<p class=\"lead\">India's state-owned NTPC Renewable Energy (NTPC REL) has awarded an engineering, procurement and construction contract to battery storage firm Delectrik Systems for a 100MWh vanadium redox flow battery (VRFB) energy storage system.</p><p>The project will be developed by technology provider Delectrik Systems in partnership with Bondada Engineering at Gujarat's Khavda Solar Park, marking the country's first utility-scale deployment of the long-duration storage technology. The battery energy storage system (Bess) is scheduled to be commissioned in the second half of 2027, Delectrik told <i>Argus</i> on 21 July.</p><p>The electrolyte will be manufactured at Delectrik's Gujarat facility, while the cell stacks will be produced at its Gurugram plant, chief executive Vishal Mittal told <i>Argus</i>, supporting domestic manufacturing of key project components. VRFBs store energy in liquid vanadium electrolyte while electricity is generated through cell stacks, enabling longer-duration storage by independently scaling energy capacity and power output.</p><p>The project is expected to be India's first grid-scale, non-lithium Bess project, broadening the country's storage technology mix beyond lithium-ion batteries that dominate current deployments, the company said. </p><p>Delectrik expects additional utility-scale VRFB opportunities in India over the next 12-24 months, including government tenders and commercial and industrial projects, Mittal said. The company pointed to a 120MWh VRFB tender issued by state-owned Gujarat Industries Power (GIPCL), for which bidding has closed and an award is expected in the coming weeks.</p><p>Delectrik previously deployed a 3MWh VRFB demonstration project for NTPC at Greater Noida in 2025.</p><p>India has 35.8GWh of Bess capacity under implementation as of March, according to the power ministry. The Central Electricity Authority's National Electricity Plan (2023) projects a requirement of 208GWh of Bess by 2030 to support the integration of growing renewable energy capacity into the grid.</p><p class=\"bylines\">By Keertiman Upadhyay</p>","lead":"India's state-owned NTPC Renewable Energy (NTPC REL) has awarded an engineering, procurement and construction contract to battery storage firm Delectrik Systems for a 100MWh vanadium redox flow battery (VRFB) energy storage system.","cmsId":"24863863","source":"Censhare"}